Showing posts with label First Nation. Show all posts
Showing posts with label First Nation. Show all posts

Tuesday, April 2, 2013

"Trutch" we never Trusted. How about Truce, Christy?

 What's in a name eh......    Names of landmarks have been changed across British Columbia like Chinaman Lake to Chunamun Lake and Boss Lake (Uranium Fame $30 million worth) to Bosk Lake.

A BC Government Website likes to hang onto the old names database, by listing off their "Alias", like it was a crime, a fraud and to a large degree, they were.   If Grandpa called the best fishing hole in British Columbia "Rum Cache", don't look for it on the map, the name is now Cicuta Lake, south-west of Vanderhoof, well before you reach the Nechako Reservoir.



Christy Clark is the MLA for Vancouver-Point Grey, although you'd never know it (RossK...... ). Within the next 33 days, before she leaves her three Offices as Premier of British Columbia, perhaps she would consider putting pen to paper and ask Vancouver's Mayor Gregor Robertson to delete the street called Trutch.    Doyle Street?

And please Christy, no more of your pandering towards specific groupings for votes with a Street name.


92% of 100% Reserve land was put aside for the 1% like Trutch, by Trutch, for Trutch!

Page 8 of  279

Land policy under Colonial B.C. 1850 - 1871

The first Indian (First Nation Land) Reserves were created in this period.  These reserves were located on southern Vancouver Island, the Fraser Valley, the Fraser Canyon, Kamloops, the Nicola Valley, the Okanagan,  and the Shuswap Lake areas.  Most of these were set up by Sir James Douglas in the early 1860's.

Douglas' reserve policy generally allowed Indians to select as much land as they wanted.  In 1861 Douglas directed the Chief Commissioner of Lands and Works, who had responsibility for laying out these early reserves, to "take measures to .... for marking out distinctly, the Indian Reserves throughout the Colony".  He added that "the extent that the Indian Reserves to be defined" was to be "as they may be pointed out by the native themselves".

This policy was dramatically reversed in 1864 - 1865 by Joseph Trutch.  As head of the colonial Department of Lands and Works, Trutch initiated a policy of reduction of the Douglas' reserves, of reluctance to allot additional reserves, and of non-recognition of the Indian's aboriginal claim  (native title).

An example of Trutch's policy of reduction can be seen along the Thompson River.  The Indians of Kamloops, Neskainlith and Shuswap Lake originally held a reserve along the north bank of the South Thompson River from Kamloops to Shuswap Lake.  This included Little Shuswap Lake and areas around Adams Lake.  In 1866 these reserves were "adjusted" by Trutch by reducing them to approximately their present size.

This policy was extended to the Fraser Valley in 1867.  It is difficult to get precise information on the location and size of the present reserves in the Fraser Valley are only remnants of the original reserves.

To learn more about these early "cut-offs" and other land grievances in the 1850 -1871 period, see the article, "Joseph Trutch and Indian Land Policy"  in B.C. Studies  (1971 - 72) by Robin Fisher.

Snip


CBC Lede: Sticker campaign targets Trutch Street signs

..... He (Trutch) also made sure Indian reserves were small, quickly overturning the generous and inclusive decisions of his colonial predecessor, Governor James Douglas.

"He reduced the reserves that Douglas had allowed for by 92% and changed the laws so that a Sto:lo family could only occupy about 10 acres of land," says Kluckner.
Trutch went on to be the first lieutenant-governor of B.C. in 1871, when the province decided to join Confederation.

"His policies and the policies of the government of the time were perfectly in keeping with serving the needs of the British government,” says documentary filmmaker Vince Hemingson.  .......

Sunday, May 20, 2012

BC Liberals forcing BC Hydro into Long Term Acquistions of IPP appears to be the MO for the sale of the Liquor Distribution Branch!

The BBC especially likes this one:  The Kerr Wood Leidal Associates Ltd. ( Kerr Wood) Run-of-River Resource Assessment for B.C. ( F5

121 pages long, but the number crunching of just how much BC Hydro customers will be paying for Run-of-the-River projects starts on Page 117!

And if you're worried about what Rich Coleman is doing about the price of your next drink, by his selling off the Liquor Distribution rights to a third party, look no further than APPENDIX M that says this:

 20.1 Privilege: BC Hydro may award an EPA to the Proponent(s) that in BC Hydro’s sole and unfettered opinion, offers the resource(s) that best serves the interests of BC Hydro and its ratepayers. The Proposal(s) having the lowest price(s) or lowest cost to BC Hydro will not necessarily be successful. BC Hydro may award no EPAs, or may terminate the procurement process at any time. BC Hydro is not obliged to provide to Proponents reasons for the award of EPAs or the rejection of any Proposal, or for termination of the RFP procurement process.

Modified to fit the sale of BC Liquor Distribution

20.1 Privilege: BC Liquor may award an EPA to the Proponent(s) that in BC Liquor’s sole and unfettered opinion, offers the resource(s) that best serves the interests of BC Liquor and its buyers. The Proposal(s) having the lowest price(s) or lowest cost to BC Liquor will not necessarily be successful. BC Liquor may award no EPAs, or may terminate the procurement process at any time. BC Liquor is not obliged to provide to Proponents reasons for the award of EPAs or the rejection of any Proposal, or for termination of the RFP procurement process.

Don't miss out on Powertech in APPENDIX E   CLEAN COAL POWER GENERATION BY CO2 SEQUESTRATION

BC Government Publications
Index for:
B.C. Hydro Long Term Acquisition Plan (... LTAP)

2009
2008
2008 Long Term Acquisition Plan Application - Revisions of August 19, 2008    PDF 2.34 MB
Appendix A Draft of the Requested Final Order - Revision of August 19, 2008 
Appendix B B.C. Government policy and regulatory documents:
The 2007 Energy Plan (B1)
SD 10 (B2)
Clean or Renewable Electricity Guidelines (B3)
Amended HSD#1 and HSD#2 (B4)

Appendix C Table summarizing the 29 BCUC Directives arising out of the 2006 IEP/LTAP Decision along with the status of each relevant Directive and a reference to the section where the Directive is addressed in the 2008 LTAP
Appendix D 2007 Load Forecast
Appendix E Direct Testimony of Dr. Ren Orans of Energy and Environmental Economics, Inc. (E3) concerning the elasticity assumptions in the 2008 LTAP
Appendix F ROU-related documents:
Resource Options Database (RODAT) sheets (F1)
The Powertech Labs Inc. (Powertech) Technology Summary Clean Coal Power Generation by C0 2 Sequestration: (F2)
BC Hydro's wind integration cost assessment (F3)
The BC Hydro Engineering report concerning Jordan River pumped storage ( F4a)
Powertech evaluation of the Jorvic Sewage Reclaim Pipeline at BC Hydro's Jordan River Hydroelectric Project ( F4b)
The Kerr Wood Leidal Associates Ltd. ( Kerr Wood) Run-of-River Resource Assessment for B.C. ( F5)
The Garrad Hassan Canada Inc. ( GH) Assessment of the Energy Potential and Estimated Costs in B.C of Wind Energy ( F6)
The AMEC Americas Limited ( AMEC) Gas-Fired Combustion Turbine Power Plant Costs and Performance Update report ( F7)
Potential Large Hydro Project report ( F8)
Integrated System ( transmission) Planning Assumptions ( F9)
Calculation of Capacity Planning Reserves as filed in the 2007 Alcan EPA proceeding ( F10) – Revision of July 4, 2008
Estimated Unit Energy Cost ( UEC) Cost Adjustment Values ( F11)
Effective Load Carrying Capability ( ELCC) Firm Energy Load Carrying Capability ( FELCC) of Intermittent Resources report ( F12)
Comparison of the 2008 ROU to the 2006 Call ( F13)
The Risk Framework Explanation and Applications ( F14)
Resource Planning Models ( F15)
Portfolios and Analysis ( F16)
DSM Resource Options ( F17)

Appendix G Three Natsource GHG price forecast-related reports, as follows:
The 2007 GHG Offset Forecast Report ( G1)
An addendum to G1 to address the B.C. carbon tax ( G2)
Natsource's memorandum estimating the probability of the main GHG scenarios ( G3)

Appendix H Global Energy's Renewable Energy Credit Market Analysis of the Potential Renewable Energy Sale in WECC report
Appendix I Global Energy's Natural Gas Price Forecast for BC Hydro report
Appendix J Four Burrard-related reports, as follows:
AMEC's Condition Assessment and Alternative Configuration Study-Burrard Generating Station:
          Current Configuration ( J1)
          Alternative Configuration( J2)
RWDI Air Inc.'s ( RWDI):
           Burrard Consent to Operate Risk Analysis ( J3)
           Permitting Requirements for Rebuilding Burrard Thermal Generating Station ( J4)
 
Appendix K BC Hydro's DSM Plan – Revision of July 4, 2008
Appendix L Two Site C-related reports:
Summary: Stage 1 Review of Project Feasibility report ( L1)
The Stage 2: Project Definition and Consultation plan ( L2)
Site C Unit Energy Cost and Recent Orders in Council ( L3) – Revision of July 4, 2008

Appendix M Copy of the Clean Power Call Request for Proposals ( RFP)
Appendix N The Fort Nelson Resource Plan-Related and Long Term Acquisition Plan ( N1) – Revision of July 4, 2008
The Fort Nelson Generating Station Upgrade Report ( N2)

Appendix O BC Hydro's Base Plan and CRPs ( O1) – Revision of July 4, 2008
Appendix P Assessment of Puget Sound Area/Northern Intertie Curtailment Risk report
Appendix Q First Nations and stakeholder engagement report for the 2008 LTAP, the Clean Power Call, Mica Unit 5 and Mica Unit 6, Fort Nelson-related issues, and the draft Application workshop presentation and intervenor comments – Revision of July 4, 2008
Appendix R Glossary and Abbreviations