The BBC especially likes this one:
The Kerr Wood Leidal
Associates Ltd. ( Kerr Wood) Run-of-River
Resource Assessment for B.C. ( F5)
121 pages long, but the number crunching of just how much BC Hydro customers will be paying for Run-of-the-River projects starts on Page 117!
And if you're worried about what Rich Coleman is doing about the price of your next drink, by his selling off the Liquor Distribution rights to a third party, look no further than
APPENDIX M that says this:
20.1 Privilege: BC Hydro may award an EPA to the Proponent(s) that in BC Hydro’s sole and unfettered opinion, offers the resource(s) that best serves the interests of BC Hydro and its ratepayers. The Proposal(s) having the lowest price(s) or lowest cost to BC Hydro will not necessarily be successful. BC Hydro may award no EPAs, or may terminate the procurement process at any time. BC Hydro is not obliged to provide to Proponents reasons for the award of EPAs or the rejection of any Proposal, or for termination of the RFP procurement process.
Modified to fit the sale of BC Liquor Distribution
20.1 Privilege: BC Liquor may award an EPA to the Proponent(s) that in BC Liquor’s sole and unfettered opinion, offers the resource(s) that best serves the interests of BC Liquor and its buyers. The Proposal(s) having the lowest price(s) or lowest cost to BC Liquor will not necessarily be successful. BC Liquor may award no EPAs, or may terminate the procurement process at any time. BC Liquor is not obliged to provide to Proponents reasons for the award of EPAs or the rejection of any Proposal, or for termination of the RFP procurement process.
Don't miss out on Powertech in APPENDIX E
CLEAN COAL POWER GENERATION BY CO2 SEQUESTRATION
2009 |
|
|
2008 |
2008 Long Term
Acquisition Plan Application - Revisions of August 19,
2008 PDF 2.34 MB |
Appendix A |
Draft of the Requested Final
Order - Revision of August 19, 2008 |
|
Appendix B |
B.C. Government policy and
regulatory documents:
The 2007 Energy Plan (B1)
SD 10 (B2)
Clean or Renewable
Electricity Guidelines (B3)
Amended HSD#1 and HSD#2
(B4) |
|
Appendix C |
Table summarizing the 29 BCUC Directives arising out of the
2006 IEP/LTAP Decision along with the status of each
relevant Directive and a reference to the section where the
Directive is addressed in the 2008 LTAP |
|
Appendix D |
2007 Load Forecast |
|
Appendix E |
Direct Testimony of Dr. Ren Orans of Energy and
Environmental Economics, Inc. (E3) concerning the
elasticity assumptions in the 2008 LTAP |
|
Appendix F |
ROU-related documents:
Resource Options Database
(RODAT) sheets (F1)
The Powertech Labs Inc.
(Powertech) Technology Summary Clean Coal Power
Generation by C0 2 Sequestration: (F2)
BC Hydro's wind integration
cost assessment (F3)
The BC Hydro Engineering
report concerning Jordan River pumped storage ( F4a)
Powertech evaluation of the
Jorvic Sewage Reclaim Pipeline at BC Hydro's Jordan River
Hydroelectric Project ( F4b)
The Kerr Wood Leidal
Associates Ltd. ( Kerr Wood) Run-of-River
Resource Assessment for B.C. ( F5)
The Garrad Hassan Canada Inc.
( GH) Assessment of the Energy Potential
and Estimated Costs in B.C of Wind Energy ( F6)
The AMEC Americas Limited (
AMEC) Gas-Fired Combustion Turbine Power
Plant Costs and Performance Update report ( F7)
Potential Large Hydro Project
report ( F8)
Integrated System (
transmission) Planning Assumptions ( F9)
Calculation of Capacity
Planning Reserves as filed in the 2007 Alcan EPA proceeding
( F10) – Revision of July 4, 2008
Estimated Unit Energy Cost (
UEC) Cost Adjustment Values ( F11)
Effective Load Carrying
Capability ( ELCC) Firm Energy Load
Carrying Capability ( FELCC) of
Intermittent Resources report ( F12)
Comparison of the 2008 ROU
to the 2006 Call ( F13)
The Risk Framework
Explanation and Applications ( F14)
Resource Planning Models (
F15)
Portfolios and Analysis (
F16)
DSM Resource Options (
F17) |
|
Appendix G |
Three Natsource GHG price
forecast-related reports, as follows:
The 2007 GHG Offset Forecast
Report ( G1)
An addendum to G1 to address
the B.C. carbon tax ( G2)
Natsource's memorandum
estimating the probability of the main GHG scenarios (
G3) |
|
Appendix H |
Global Energy's Renewable Energy Credit Market Analysis of
the Potential Renewable Energy Sale in WECC report |
|
Appendix I |
Global Energy's Natural Gas Price Forecast for BC Hydro
report |
|
Appendix J |
Four Burrard-related reports, as
follows:
AMEC's Condition Assessment and Alternative Configuration
Study-Burrard Generating Station:
Current Configuration (
J1)
Alternative Configuration(
J2)
RWDI Air Inc.'s ( RWDI):
Burrard Consent to Operate
Risk Analysis ( J3)
Permitting Requirements for
Rebuilding Burrard Thermal Generating Station ( J4) |
|
Appendix K |
BC Hydro's DSM Plan – Revision of July 4, 2008 |
|
Appendix L |
Two Site C-related reports:
Summary: Stage 1 Review of
Project Feasibility report ( L1)
The Stage 2: Project
Definition and Consultation plan ( L2)
Site C Unit Energy Cost and
Recent Orders in Council ( L3) –
Revision of July 4, 2008 |
|
Appendix M |
Copy of the Clean Power Call Request for Proposals (
RFP) |
|
Appendix N |
The Fort Nelson Resource Plan-Related and Long Term
Acquisition Plan ( N1) – Revision
of July 4, 2008
The Fort Nelson Generating Station Upgrade Report (
N2) |
|
Appendix O |
BC Hydro's Base Plan and CRPs ( O1) –
Revision of July 4, 2008 |
|
Appendix P |
Assessment of Puget Sound Area/Northern Intertie Curtailment
Risk report |
|
Appendix Q |
First Nations and stakeholder engagement report for the 2008
LTAP, the Clean Power Call, Mica Unit 5 and Mica Unit 6,
Fort Nelson-related issues, and the draft Application
workshop presentation and intervenor comments –
Revision of July 4, 2008 |
|
Appendix R |
Glossary and Abbreviations |