Enbridge's latest oil spill, today, will probably be a result of plump "Pigs" plugging pipe

 Snipped
.......At about 2:45 p.m. Friday, workers in Enbridge Pipeline’s Control Center detected a pressure drop in the pipeline. Control Center operators (in Edmonton, Alberta) shut down and immediately isolated the line, with a capacity of 317,600 barrels per day, and Enbridge emergency crews were promptly deployed to the site, according to a news release from Enbridge.
Officials moved one person from his home for his safety and comfort, said Lorraine Little, Enbridge spokeswoman........ - Winsconsin Rapid Tribune
 Snipped

 As if Enbridge has had enough problems with oil spills, what next, yes, what next..... one would have to say that maybe its the competition to Enbridge who is just waiting in the wings to take over.  But, can they do a better job than Enbridge....

 Google Search Criteria    are Enbridge oil pipelines double walled

Didn't know why we couldn't access this file earlier today, came up with "404 Error: File Not Found" , but.... along the bottom of the first result was    "ALL 2 Versions".....   one of two didn't fly, note Error message above, but..... the second of two versions worked just fine....     What the BBC was not aware of, was the oil spill, as we researched.

Design and contruction of 42-in liquid pipeline batch pig facilities

R Kratsch - 2008 - gs-press.com.au
... Combined with the Canadian portion of the pipeline system operated by Enbridge Pipelines Inc., the system ... the launcher for launching the pig and for increased draining of the crude oil out of ... Pig signals are positioned upstream of the receiver and on the receiver barrel and to ... - All 2 versions
Link to "All 2 versions" results in this......

Design and contruction of 42-in liquid pipeline batch pig facilities

R Kratsch - gs-press.com.au
ENBRIDGE'S CURRENT major expansion called “Southern Access” is a 42-in liquid crude oil pipeline running 321 miles from Superior, WI to Delavan, WI in 2008 and continuing another133 miles to Flanagan, IL in 2009. As part of the goal to achieve and maintain a high ...

Design and Construction of 42” Liquids Pipeline Batch Pig Facilities

RW Kratsch - 2008 - link.aip.org
Enbridge's current major expansion called “Southern Access” is a 42 liquid crude oil pipeline running 321 miles from Superior, WI to Delavan, WI in 2008 and continuing another 133 miles to Flanagan, IL in 2009. As part of the goal to achieve and maintain a high ...
Enbridge's current major expansion called “Southern Access” is a 42 inch liquid crude oil pipeline running 321 miles from Superior, WI to Delavan, WI in 2008 and continuing another 133 miles to Flanagan, IL in 2009. As part of the goal to achieve and maintain a high quality pipeline system, an automated batch pig system was required to remotely launch the batch pigs, operated from the Control Center in Edmonton, Alberta, Canada...........SNIP

If Enbridge's Control Centre continues to be located in Edmonton, and Kitimat the final destination, most land EAST of the Canadian Rocky Mountains is FLAT, whereas the land WEST of the Canadian Rockies is NOT flat.  Its one thing for the Edmonton Control Centre to note a drop in OIL pressure, with a further "317,600 barrels of oil per day" chomping at the bit, for Eastward bound oil, but what of our position, that is British Columbia, whereby our terrain is far from Flat, and few highways.

Will Enbridge crews gain access to THEIR BC pipeline, if its broken, as easily as it is in the heavily populated, heavily riddled with highways of their eastern laid pipe lines?   eh......

And come to think of it, if its WINTER conditions, well yes, if one waits until daylight Black on White will make it easy to spot, oil spill that is, runs downhill, but just how are Enbridge's response crews suppose to get to the line............

Yes, yes, yes, looking at a map, A paper map, is flat, so too is our computer monitors, looks easy to cross, but have these Enbridge guys, these politicians, these .....advisers to the politicians and oil companies,..... have they ever left their offices, put on gumboots and hip waders to go looking for oil on the loose?

Friday, July 20, 2012

Translink vehicles may use the Lions Gate Bridge, but not "Trucks"

 Truck Route Maps and Regulations   UPDATED: December 2, 2013
Truck Route via City of Vancouver 2013
 Vancouver City Police could be raking in a ton of cash, for the Santa Claus Parade on bikes, in 2014.



************************
"Truck" means a motor vehicle designed or used primarily for the transportation of property.  Page 8 of 92  City of Vancouver  BY-LAW NO. 2849
NOTE: In the link which we have highlighted below in BOLD BLUE   "First Narrow Bridge" via Wikipedia they have written this:  "Trucks exceeding 13 tonnes (14.3 tons) are prohibited"    WHICH isn't true.  NO TRUCKS are permitted because........... read on Dear Readers.

UPDATE:  July 25, 2013

Prohibited vehicles, bicycles and tire chains

9 The following apply to and in respect of the First Narrows Bridge only:
(a) a person must not operate, on any part of the structure or its approaches, a vehicle having a gross weight in excess of 13 000 kg unless the vehicle is a bus as defined in the Motor Vehicle Act;
(b) a person must not operate a bicycle on the roadway of the structure or its approaches;
(c) a person must not operate, on any part of the structure or its approaches, a vehicle equipped with a tire chain or chains.

More and more times we're seeing "trucks" using the First Narrows Bridge, and probably the cause of this sudden influx/outflux is that the drivers, and/or swampers, have a GPS which is telling them that the shortest route between "A" and "B", "downtown Vancouver" and the "North Shore", or visa versus, is via Stanley Park's Causeway, which is true, it is shorter, but.....

There's one catch though, maybe even two catches....... TransLink buses probably outweigh "Trucks" threefold or more in some instances, but the City of Vancouver has determined that although "trucks" may have a lesser GVW than a Bus and the bridges are strong enough to carry both trucks and buses within the allowed GVW per vehicle, they also have right to write a Bylaw, which they did, to designate that the two bridges are NOT Truck Routes.   Passenger cars and cyclists need only apply.

Coast Mountain GVW:
Gross vehicle weight rating – the maximum recommended weight for a vehicle, including: the weight of the vehicle itself, fuel and other fluids, passengers, and all cargo. The manufacturer determines the GVWR. The Motor Vehicle Act Regulations of British Columbia prohibit vehicle operators from loading their vehicle in excess of its GVWR.   - Page 40

For youngsters, once upon a time our beloved Lions Gate Bridge was given a major face lift with the deck replacement, but before that face lift, the bridge had developed a severe "back" strain to its North supporting column..... because of the heavy loads of "trucks" taking the route as their regular route.

That was stopped once the engineers figured out what was going on, or it should have been stopped.

There's a story from ten or eleven years ago where a trucker arrived in downtown Vancouver a half hour ahead of time after coming over from Vancouver Island, where upon he climbed into his sleeper compartment for a nap.   When queried as to why he arrived so early when he shouldn't have arrived EARLY at all..... they discovered he had used the First Narrows Bridge......the Lions Gate, to cross over Burrard Inlet.   OOOOPS!    The Driver should have used the Second Narrows Bridge which would have taken a half hour longer.....and made him on time for his destination.

*****************************************

For Trucks:

Total width no greater than 2.6m(8’6”).
Total height no greater than 3.81m(12’6”) on any street or 4.3m(14’1”)on any truck route.
Total length (inclusive of load and front and rear bumpers) no greater than:
• 12.5m(41’) for a single vehicle.
• 23m(75’3”) for a vehicle with 1 trailer.
• 25m(82’) for a vehicle with 2 trailers.
VEHICLES EXCEEDING ANY OF THESE DIMENSIONS MUST OBTAIN A PERMIT
==================================================

If the Vancouver City Hall wants to earn more cash, and create a safer driving experience for motorists, then there should be fines collected.   In the case of the First Narrows... Lions Gate Bridge, there are options by which over size, TRUCKs, could learn from their experience.... of receiving multiple fines.   Stanley Park Causeway, north bound, is not the end of the road for Truckers, they could take the off ramp just before heading for the bridge deck... and take a tour of Stanley Park...and eventually end up on the Second Narrows Bridge.  If they continue to cross the bridge, then a Two Hundred Dollar Ticket should be enough of a carrot to deter them in the future....   South Bound truck traffic, same story.   No officers required.  All that is required is a system similar to the Port Mann Bridge, and only three lanes need monitoring.

The Ticket, is in the Mail.




Thursday, July 5, 2012

"The media is the surrogate of the public." - Associate Chief Justice Anne MacKenzie


Here at the BBC we know that the Public reads Court decisions, not all decisions, but we have a tendency to keep a close eye on the high profile ones, like the BC Rail Trial which just doesn't want to die.

After the dust settled with the appearance of a BC Liberal buy-out using $6 million of taxpayers monies to secure guilty pleas that killed the BC Rail Trial, the Press went to bat for the public, or did they?

Has the Press been that Mother/Father to the Public, or have they been more interested in what's in it for them and their corporate or political sponsors?

What are we ranting about here today?  Its this closing statement by Associate Chief Justice Judge MacKenzie on June 2, 2011 as to how she views the Public, perhaps how all Judges view the Public, as being cared for by the News Media.

Ruling on Application for Release of Materials                                          [29] The fact the Materials have already been released strongly supports Mr. Krog’s submission that there will be no harm to the administration of justice if they are also released to him. The media is the surrogate of the public. Mr. Krog is a member of the public with a responsible position or role to fulfill. I cannot assume he brings this application in bad faith, or intends to harm the administration of justice. For these reasons, I grant Mr. Krog’s application in the same terms as the February Media Order.

The media has never asked the Associate Chief Justice for the BC Rail Trial, and all things related, just what she meant by  "The media is the surrogate of the public." so they must be in agreement with her thoughts on how the Public is "cared for", lovingly, by  Mother Media and Mother Judges to boot.


Here's a background document for the basis of MacKenzie's "Surrogate Media" people.
 The media is the public’s surrogate, observing and reporting on matters of interest and concern to the public.We’ve all heard it said that justice must not just be done, it must be seen to be done.  -   The Canadian Justice System and the Media

For the Lay Person:

A Google search for surrogate definition

sur·ro·gate/ˈsərəgit/


Noun:
  1. A substitute, esp. a person deputizing for another in a specific role or office.
  2. (in the Christian Church) A bishop's deputy who grants marriage licenses.



surrogate n. 1) a person acting on behalf of another or a substitute, including a woman who gives birth to a baby of a mother who is unable to carry the child. 2) a judge in some states (notably New York) responsible only for probates, estates, and adoptions.





**********************************
One other minor detail regarding MacKenzie's.... "The media is the surrogate of the public."    The Media turned a blind to .......

"...a Mountie decided to treat Bornmann as a witness after admitting to bribing a public official"

Tuesday, June 26, 2012

Bravo Company will conduct a Cordon and Search aka "IAW SoM, B Coy CM1005 IVO Gr 12U QQ 1234 5678."

If you consider yourself to be John/Jane Doe public, have never served in Canada's armed forces, then you won't know what the title of the Post means.

UPDATE: June 27, 2012 These guys would/should know:
Defence Research Establishment-Ottawa (Jun 27 2012 10:34:41am)

Then again if you are John/Jane Doe public, and have read the Province article from June 25, 2012's newspaper (but really written by the Canadian Press) where its called  Easing the soldier to civvy transition subTitle:  "Serving members seek help before being medically released", then you have no right to determine how to ease the soldier into Canada from overseas.

You have no idea what it's like "over there".   Neither do I, but over the weekend, I read a book, and I think I know a little bit more, than you.

Hint:    ISBN Dog tags: 978-1-44340-717-5, Written by Ryan Flavelle.



 SO, HERE YOU HAVE IT.  You are reading the first lines of my first book, the culmination of all my efforts to get a book published.  First of all, I would like to thank you for reading this book ---unless you stole it or are reading the Google Books "preview" -- in which case, go buy my book.  I'm a poor graduate student/reservist.

The title is     "The Patrol",
subTitle is: "Seven Days in the life of a Canadian Soldier in AFGHANISTAN".



Translation of Post Title:
For example, "Bravo Company will conduct a Cordon and Search of suspected compounds near the village of Zangabad" becomes "IAW SoM, B Coy will conduct CM1005 IVO Gr 12U QQ 1234 5678"
It would be easy to provide a link to his book, in Google, but it's even easier to write:  

Stand up, and go to your Local Library!


If you do go to your local library, the authors, illustrators, photographers, publishers, etc. of books in general, receive some compensation, a pittance compared to royalties per book, from the Public Lending Right Commission (Federal)... until Harper gets wind of it.

*********************************

Flavell spent SEVEN months in Afghanistan, fighting.

Tuesday, June 5, 2012

Smart Meter compared to other RF devices like a Baby Monitor, a Cell Phone, a Microwave

Update May 23, 2013 : Link to Bob Mackin's 2010  Gold Rush: 

Smart meter info kept secret until after the election 


Photo UPDATE at the bottom  June 5, 2012   

 Photo UPDATE at the bottom  June 19, 2012   Letter from Curtis Bennett to Enderby City Council

Here's another one of those June 1, 2012 documents that the BC Liberals like to roll out during the Summer Legislative Recess, even though it was created on April 5, 2012.   Its an Amended Report, but what else were you expecting.

 Amended Report on BC Hydro Smart Meter Measurements

 
"Smart Meters will send  brief pulses every 5 minutes (5 minute interval interrogation)"... which means of course that they will be doing it 24/7

Its not clear in this document if the "number" for each device is of equal duration.  All we know is that from the data provided it might be for only of a duration that the Public would normally use their current home devices eg.

When the baby is sleeping (a nap)  teething certainly negates the reason for having a RF Baby Monitor, eh.

Cell Phone, is it sending out a brief pulse 24/7, or only when called upon?

Microwave Oven, Midnight popcorn making, cup of tea for the teetotalers, thawing the chicken for supper.

Smart Meter    brief pulses every 5 minutes (5 minute interval interrogation)



DEVICE

Instantaneous Peak Power Density at 30 cm (Source: Ref. 2)
In units of μW/cm2

RF Baby Monitor      15.6275

Cell Phone                  9.6425

Microwave Oven        7.0775

Smart Meter               4.035




A Smart Meter is on ALL of the TIME

The following is supposed to be BC Hydro's answer to the Public's concerns by comparing their Smart Meter to other devices in our homes... but, but, but.....


 

















Smart meters are designed to emit pulses that last approximately 100 to 150 milliseconds (0.1 to 0.15 seconds) at irregular intervals.

 - In a cluster of smart meters, the meters do not emit simultaneously but are programmed to communicate with a single controller in a random sequence. This mode of operation eliminates the potential for exposure to more than one signal at the same time (Ref.1).

 - In this trial, smart meters were scheduled to emit brief pulses every 5 minutes (5 minute interval interrogation). - The continuous monitoring of RF levels was maintained for a time period of 10 minutes at each position of the probe to ensure that the highest possible RF exposure level was detected and recorded.
Which probably means for condos and apartments where there are BANKS of Smart Meters, the emission of brief pulses communicating with a single controller in a random sequence means that there will be CONSTANT supply of pulses.   Forget the 5 minute intervals!  Its pedal to the metal pulsing.

There is one other detail that wasn't mentioned in their trial of a Smart Meter, and that is each of the Household Devices that were used, are all 110 volts.

Your house, your Apartment, your basement secondary suite, your Condo, have 220Volts running through their "veins".

Do you think that a 110 volt line, normally used to power a lamp stand (in a carpeted room) as a bona fide example, as used in these photos below, ..... would there be enough juice to power TEN Smart Meters let alone even ONE Smart Meter?   In the real world One Smart Meter is supposedly feeding the electricity to the WHOLE house.......



See the singular electric cable coming from the left hand of the display unit which is getting its power from a wall outlet..... which might be fed through a 15 amp breaker!!!!

The point here is why go through the process of mounting 10 Smart Meters on a display wall when all they had to do was mount the "Device" that emits the RF signal on each of the Ten units and record that information.

Is it all about show and not tell?

*********************************

Letter from Curtis Bennett to Enderby City Council

Thermografix Consulting Corporation

June 17, 2012

Enderby City Council
Enderby, B.C.

Att: Chair of Smart Meter Committee – Councillor Earl Shipmaker
cc: Barb Makota, Edgar Murdoch

Re: Questions for BC Hydro on Smart Meter Safety

Dear Councillor Shipmaker;

I was asked to provide information on Smart Meters in my professional capacity as an electrical professional with interprovincial credentials provided by the BC and Canadian Governments.

Smothering Enderby in RF EMFs for ease of communication has serious consequences for the entire community and BC Hydro's presentation for Enderby won't represent them. Power Density is incomplete but alarming language by itself. It means everything the EMFs touch or go through are in the wireless circuit and uninsulated from the frequencies. Power density exists when frequencies create the wireless circuit. Power is watts, volts times amps and all unprotected biological systems have frequencies of their own that were left out of the EMF equation.

Health Canada's Safety Code 6 governs limits of human exposure to wireless frequencies and the predominant health effect to be avoided is the unintentional stimulation of tissue as is the heat effect. Intentional stimulation is medical imaging like an X-ray. When you have X-rays, your body is positioned, protective clothing covers parts of your body for attenuation(elimination) of the frequencies on your side of the clothing. Refusing the protective clothing isn't optional because of the dangers and liabilities.

The highlighted area on Page 19 from the BC Utilities Commission stating they have to comply with Safety Code 6. http://www.thermoguy.com/pdfs/BC-Utilities-Commission-BCH-Smart-Metering-Infrastructure-Program-Business-Case.pdf

The highlighted area on Page 2 in BC Hydro's Fact Sheet states Safety Code 6 is the law and same science standards as the FCC. http://www.thermoguy.com/pdfs/BC-Hydro-RF-Fact-Sheet-Detailed.pdf

Page 9, paragraph 2 of Safety Code 6 admits critical mechanisms are missing linking frequencies to adverse health effects. The weight of evidence approach will be used when mechanisms are found and code will be changed if necessary.
http://www.thermoguy.com/pdfs/Safety_Code_6.pdf

Errors or omissions in Safety Code 6 substantiating the mechanism linking frequencies to adverse health effects were reported to Health Canada and by expert witness at the request of Canadian Parliament's Standing Committee on Health. It was also reported to BC Hydro, BCUC and the BC Government that the frequencies in this application no longer complied with Safety Code 6.

Safety Code 6 admits humans are being electromagnetically induced but negated to include frequencies of ALL electrical considerations, frequencies associated with biological system's function. Humans were treated as Kilograms of tissue being heated by watts. Omnidirectional Smart Meter Routers, tower antennas capable of communicating with thousands of smart devices weren't considered for their interaction with anything including buildings caught in the EMF. You can't blast frequencies around with reckless abandon.

Questions for BC Hydro:

BC Hydro's electrical grid runs at 60 Hz, what happens if the 60 Hz changes? What would happen if the 60 Hz grid was electromagnetically induced? What would the resultant frequency be?
What frequencies of human biological systems did BC Hydro use in frequency interaction considerations.
Location of Smart Meter Routers and how big of an area do they cover.
B.C. Hydro Fact Sheet, page 1 under Proximity states the meter base acts like a reflective shield and further reflects the frequencies away from the resident? The frequencies from Smart Meter Routers and other wireless antennas are hitting buildings from top to bottom communicating with the meter. Can BC Hydro please provide the attenuation coefficients of everything hit by the EMF between the routers, antennas and meter bases holding the Smart Meter? That includes bees, birds, bugs, trees, humans, pets, angles, any biology, any materials of any kind.
The frequencies from the routers are going through building materials, fire separations and hitting anything in their path. Can BC Hydro provide the attenuation coefficients for the building materials including electrical/mechanical systems and the documentation from engineers showing attenuation(elimination) of the frequencies at the building?
Do the frequencies from the Smart Meter Routers, Antennas hit buildings and stop at the meter base or do the frequencies go through buildings? Can BC Hydro provide the required documentation from engineers showing attenuation(elimination)
Can BC Hydro please show documentation the smart meters were tested for accuracy in an EMF under full load of router(4000 smart devices)?
Where is the engineered response from BC Hydro and Minister Coleman on the frequencies going through walls, vibrating structural components causing non compliance with BC Building Code. http://www.thermoguy.com/pdfs/BC-Energy-Minister-on-Wireless-and-Building-Code.pdf
The dangers of wireless frequencies is now lectured in medical academia for education credits doctors need for licensing, did BC Hydro report that to Enderby or other municipalities? http://www.thermoguy.com/pdfs/Medical_Education_Letter_on_Wireless_Lectured_in_Medical_Academia.pdf
The American Academy of Environmental Medicine press release on Smart Meter, was this shared with Enderby? http://www.thermoguy.com/pdfs/AAEM-Resolution.pdf
Did BC Hydro share with Enderby Council, local professionals or constituents the accelerated corrosion information when radiating infrastructure? Refer to Andrew Michrowski.

Frequencies penetrating the body at any depth/angle has serious consequences. Electromagnetic induction of unprotected human electrical grid, causing nerve and muscle stimulation, 180 degree polarization of molecules 1.8 billion times per second at 900 Mhz or twice the frequency. That could break anything including DNA and produces heat not being discussed.

There are serious unanswered questions and a ban on Smart Meter installation is the only option until the weight of evidence is employed as per Safety Code 6. Enderby Council, citizens and Hydro needs to be warned on this very complex issue. This isn't a property dispute, this is a frequency and biological weapon when applied like this. We are not wearing protective clothing to attenuate the frequencies, neither are the buildings. BC Hydro and Health Canada have science to complete and resubmit new calculations. Electrical Engineers don't know frequencies and critical information was left out of an electrical equation.

It isn't insurable to neurologically stimulate populations and Health Canada says that happens but humans weren't considered electrical. Radiating buildings and infrastructure without informing municipal administrators, their science professionals, first responders, education, unions, insurers, pacemaker recipients, health monitoring, medicine, is dangerous.

Sincerely,

Curtis Bennett
Chief Science Officer
Interprovincial Journeyman Electrician(Red Seal)
Engineering Technologist
Adjunct Faculty, IHF & GEDI
Thermografix Consulting Corporation www.thermoguy.com/emfeducation.html

Friday, May 25, 2012

Rich Coleman and Christy Clark are living together, hypothetically, just to prove that a family of five can reduce their $200 in Utility bills in Vancouver to $140

Update at the Bottom regarding "Dear Readers" contributions.....

Last year, BC NDP MLA  Jagrup Brar temporarily gave up his home, and salary, and lived on $610 welfare for one month. LINK  UPDATED 2023-12-26

What the BBC is suggesting here, is that two respected MLAs, Richard Coleman and Christy Clark, temporarily give up their residences, and salaries, and live in a 1946 home in Vancouver, for one month with their average Energy bills (electricity  and Natural Gas) totaling no more than $200.   I suppose the real challenge will be to find a home who's utility bills are really $200 in Vancouver, because that's the problem that the BBC is finding where the current Energy Minister and a previous energy minister says that the energy bills (electricity) have traditionally been less than $100!   Throw in the Natural Gas and the total is no more than $200!  Again, that last number is one that Energy Minister and BC Hydro have been using to sell their customers on how to make their Energy bills seem to almost disappear, almost by sleight of hand.



Back in 2010, the then Energy Minister, Steven Thomson said:

 An average residential electricity bill is about $71 per month. BC Hydro is currently forecasting an average monthly bill increase of about $7 each year for each of the next three years. However, these rate increases are only estimates and are subject to further BC Hydro review and approval by the BCUC.

Along comes Rich Coleman as Energy Minister and by 2012 he jumps on an ambitious program using as an example a home  built in 1946, needing sealing (windows and doors), retrofitting (insulation), is costing $200 per month, but then again who's to say that the numbers Thomson and Coleman are using is an average of only well sealed/insulated homes or all of the of the homes across the province of British Columbia.

For example the BBC home is a ten year old house, 2,600 square feet,  insulated to the hilt, sealed as well, 2 X 6 walls which means MORE insulation to insulate the home therefore lower energy bills.... and for owners of homes where the property building lot is only 33' Wide, their walls are a mere 2 X 4 thick construction.  You'd think the BC Liberal Government would modify the BC Building code to make changes that would ensure that the least amount of energy is lost.

The BBC home Energy costs are rounded up thusly to the nearest whole dollar:

BC Hydro $280 per month .... Fortis: $130, in other words $410 per month ..... just where does Coleman and BC Hydro get their numbers from........ if the 1946 home, 66 years old, in Vancouver, needs a lot of work done on it now..... LOL... they'd be better off not spending a dime to upgrade!   Wear sweaters in the winter!

Its been shown, with the recent implementation of Smart Meters, that there are some mighty high metering going on, and those bills are  no where near the hypothetical $200 per month that the BC Liberals speak frequently of. 

Energy Minister Coleman's Pays-BC shows how "he and she" can have their "cake and eat" it too scenario .... where a hypothetical Vancouver family, struggling with a monthly payment of $200 for the energy being supplied to their home....??????

Where did that number come from?

Does it matter?

Possibly.....

"Pay As You Save-BC program"

"Pays-BC Utility Program"

"The key to unlocking consumer savings"

PAYS_Document_Jan_28_2012_FINAL.pdf

Here's a page from the above link, we have to tell you though its a Fairy tale book, written by BC Hydro to assist "Rich and Christy" in their Families First purchased home, from just last year: (Note: a 1946 home is worth $1,299,000, purchased with 2012 Dollars)

To begin the Fairy Tale adventure:

John Rich and Susan Christy and their three children (Huey, Duey and Luigi) live in a home built in 1946 with an existing Natural Gas furnace, Electric hot water heating, limited insulation and draughty single pane windows. On top of their mortgage payments, Rich and Christy pay about $200 in energy bills every month. They are concerned about having a comfortable home to live in, and rising energy costs, as well as conserving energy to protect the environment. However, they don’t have the spare savings, or other sources of credit, to spend on major renovations or home upgrades. Also, with their growing children, Rich and Christy anticipate needing to move to a larger home within the next five years.

Looking for an understanding of the potential costs and benefits of various options for improving their home, family comfort and health – without “breaking the bank” – Christy finds a local provider of home energy assessments after seeing a news article in the local paper. The energy assessment costs $150 (which may be paid for through PAYSBC when  Rich and Christy decide to participate in the program).

Their independent assessor, Wendy El Gordo of IPP Fame, uses the established EnerGuide Rating System to determine the energy efficiency performance of their home, including an EnerGuide rating, and recommendations for energy retrofits that will reduce energy consumption. Reviewing the assessment report with Rich and Christy, El Gordo shows them where air is leaking out through their attic, basement, walls and around doors and windows – and notes that their water heater will soon fail or need to be replaced. The energy assessment report shows, based on modeled energy consumption of the current house and the same house after proposed upgrades, that if Rich and Christy improve their insulation, replace their windows and upgrade their water heater, they can save an estimated $60 per month on their energy bills.  (Editor Note:  $140 Total to be paid each month instead of $200.)

Rich and Christy decide to proceed with the renovations and arrange for a contractor approved by their utility to complete the work – with no up-front cost....... cont'd

Keep in mind here, the scenario offered above.... Rich and Christy are only going to stay in the house for FIVE YEARS and then MOVE OUT, and UP.
**************************************

Is this is where Energies Ministers Steven Thomson and Rich Coleman delved into for appropriate numbers that would match their spiel to the public? :

March 6, 2012

BC Hydro's rates are among the lowest in North America

Snip.....If you're a residential customer consuming about 1,000 kWh/month, your monthly bill is about $82 — or 8 cents per kWh — which is fourth lowest among the utilities surveyed...... Snip Rates comparison chart

Back to Rich and Christy Living together temporarily, hypothetically.

First they have to find a home that consumes 1,000 kW.h/month, was built in 1946 and is in Vancouver.

BC Hydro rates update, including a look at recent BCUC decision
Each year, BC Hydro is part of a survey that compares BC Hydro's rates with those in 21 other jurisdictions in North America. The results are included in the Electricity Rate Comparison Annual Report, which compares BC Hydro's monthly bills and average prices for residential, commercial and industrial customers against other utilities.
If you're a residential customer consuming about 1,000 kWh/month, your monthly bill is about $82 — or 8 cents per kWh — which is fourth lowest among the utilities surveyed.
Hydro-Quebec tops the list at $68 for 1,000 kWh/month, while 15 of the 25 jurisdictions on the list are at $100 or more. Two — Consolidated Edison in New York, and Pacific Gas & Electric in San Francisco — are over $200.
BC Hydro's rates for all customer segments continue to remain within the top 25 per cent of utilities for 2011/12. For the most part, the five jurisdictions that consistently rank the most favourably in the report are BC Hydro, Hydro-Quebec, Manitoba Power, Pacific Power and Light (Portland, Oregon) and Seattle City Light. View the comparison chart above or see the full, detailed Rates Comparison Report [PDF, 485 Kb]. 

The Rates Comparison Report  link above, check out page 14 of 17, it will look like this:

 Table 9 BC Hydro Monthly Bills Summary

Vancouver, BC April 1, 2007 1 April 1, 2008 2 April 1, 2009 3 April 1, 2010 4 May 1, 2011

Residential

625 kWh 42.97 45.09 41.19 45.00 47.24
750 kWh 50.81 53.32 50.44 55.11 58.06
1,000 kWh 66.49 69.78 71.32 77.93 $82.71
2,000 kWh 129 136 155 169 181
3,000 kWh 192 201 238 261 $280

Highlighted in Blue above is 1,000 kW.H for 2011

Highlighted in Red above is 3,000 kW.H for 2011
********************************************





**********************************************

To be absolutely fair here:

The BBC is a typical home on the North Shore, in other words the BBC $280 number from above, is calculated like this:

STEP 1 = 1398 kW.h @ $0.06670   $ 93.25

STEP 2 = 1592 kW.h @ $0.09620   $153.15

Plus Rate Rider at 2.5%

Regional transit levy: 63 days @ $0.06240/day
*HST BC HST Residential Energy Credit Total $279.41

Go for it Rich, Cristy, BC Hydro, tell us another tale about saving money when you can't even do it yourselves.

**************************

Rate Rider (explained in Google) and via BC NDP

The rate rider is applied to the total of all charges, before taxes and levies. Amounts received from the rate rider will be used only to pay down BC Hydro's deferral accounts. BC Hydro uses these accounts to record unexpected costs and prevent sudden rate fluctuations that could result, for example, from higher-than-forecast market prices for energy.

*********************************

Dear readers,

Would you like to share the basic information of your Combined, or separate totals of your energy bills?

Would you also like to mention where in British Columbia, or nearby, that you live?

And for those who live near Prince George, and burn wood to heat your home, would you like to contribute your information as well?   Would you also mention your lighting system..... kerosene  perhaps
 *****************************************
 In this day and age of owning a home, a Secondary suite is a must.  For owners like John and Susan and/or   "Richard and Christy" with three children, living in a 1946 home in Metro Vancouver, its probably already been converted to having a secondary suite, legal or illegal.

Legal means that there is a firewall between the two; Legal means that the Smoke alarms are Hard Wired together to ensure that if a fire does break out in one, the other suite won't be sleeping through it!;  Legal means two cans of garbage picked up for each entity; Legal means Landlord (property owner) paying an increased rate for Water, Sewer and Garbage;  Legal means, in most instances, the Owner lives upstairs;  Legal means the owner gets to write off expenses and to declare the income.   Illegal means each cheque written by the tenant to the Landlord, isn't declared as income by the Landlord......no write offs, but they do get to go to Hawaii once a year; they do get to top up their RRSP by using the suite rent to pay for groceries; etc.......

Legal Tenant means you set your own thermostat and not dependent on whether the "guy" upstairs is warm enough.

Municipalities do NOT actively seek out illegal secondary suites unless there are complaints laid by nearby residences.

Word of warning to "Richard" and "Christy", if ever you decide to run for Office... make sure your track record on your basement suites have been above board, at all times!

*************************************

Here's a Screen Shot of part of Page 14, Residential Monthly Bills Summary


e.a.f. is using approximately 1,000 kW.H for 2011
BBC is using 3,000 kW.H for 2012
Richard and Christy were using approximately 1,400 kW.H for 2011
Richard and Christy's uprgrade 1,200 kW.H for 2012
North Shore News example 600 kW.H for 2012
****************************************
Basic energy cost info contributed by Dear Readers:


Update  May 25, 2012

e.a.f. Home

1  Electrically heated
2  1200 sq. ft.
3  line dry laundry in the summer & in winter one out of 3 loads

4  use the dishwasher twice a wk
5  double windows
    Note:  keep 2 rooms which aren't used at 16; the others at 20
6  located north of Parksville
    Note: Lower rate because of a secondary backup heating system
7  Cost per month $88 yr round.
****************************

BBC Home

1  Primary, forced air furnace, Natural Gas
1  Secondary suite electric baseboard
1  Both have Gas fireplaces
1  Hot Water Tanks  Natural Gas
2  2600 sq. ft.
3  Primary, laundry twice a week
3  Secondary, laundry seems like daily.... they have children
4  Secondary, Dishwasher, three times a week
5  Double windows
6  North Vancouver
7  Cost per month $410 yr round 
8  Cost split between Primary and Secondary 
****************************

Rich and Christy's home

1  Forced air Furnace
1  Electric Hot Water Tank
2  2156 sq. ft.
3  Laundry, five times a week
4  Dishwasher, five times a week

5  Single windows
6  Vancouver (East) near Main Street
7   $200 per month yr. round 
*****************************

Rich and Christy's home  after renovation

1  Forced air Furnace
1  Natural Gas Hot Water Tank
2  2156 sq. ft.
3  Laundry, five times a week
4  Dishwasher, five times a week
5  Double pane windows
6  Vancouver (East) near Main Street
7   $140 per month yr. round
*****************************

From the North Shore News, Letters section, May 27, 2012,
 there is a retired BC Utilities Commission Secretary who is complaining about the Smart Meter

on-line Letter to the Editor NOT PUBLISHED yet, its Saturday

1 ?
2 4000 sq. ft.
3 ?
4 ?
5 ?
6  West Vancouver, north of Park Royal
7  $39 for electricity ONLY.... no mention of Natural Gas.

$39?
********************************************

2 Examples From CTV British Columbia

Carlo.....
Richmond Apartment

$93 before his smart meter was set up

to $172

and then $241 on his most recent bill.

                 *******************************
 Susan...... One Bedroom Condo


was $61 monthly before the Smart Meter

after the Smart Meter was installed... $745

***********************************************


BC Hydro Conservation Tips (below) & Electricity Rates (see page 2 ...

pendercommunitytransition.ca/.../Conservation-BC-Hydro-Tips-Rates...
File Format: PDF/Adobe Acrobat - Quick View
*from www.bchydro.com as of April 12, 2011. Conservation tip ... **Estimated net cost after incentives ... Currently, an average residential electricity bill is about $71 per month [$852/year – SEE NOTE BELOW]. BC Hydro is ... A few examples: ...

Bottom of the document is this.................


NOTE: Average residential Hydro bill for 2011:

is about $71/mth ($852/year) for about 12,100 kWh/year

(8100 kWh @ $.0627 = $507.87; 4000 kWh @ $.0878 = $351.20,
total $859 for 12,100 kWh per year

($71.58 for 1008 kWh/mth, plus 12% HST)

Wednesday, May 23, 2012

Hyperthyroidism in Cats...... and dogs

You may have missed our Post on blood transfusions, for Cats and Dogs....... the BBC wrote that one just under a year ago.  Yes, blood transfusions.  Hopefully you won't need to be scrambling around to find this sort of information when you least expect it...... and to clarify, its really not supplied by the RED CROSS, but what the Vets need to do to save a "life" of a loved one, it's close enough to the truth.

"Red Cross Blood" transfusions for cats / dogs? Not only on the North Shore of Vancouver.

You may laugh, but when it comes to having pets, we have two cats in our household, and when I say "in", I mean exactly that, they're not the outdoorsy variety.   We want to keep them safe and not have them bringing any trophies back........ like one cat did......   38 years ago...... once it was a partial RAT and the next time it was a snake.


The Female had a slight problem, something called Hyperthyroidism.

She was always meowing for food (raw food - see the above Post), taking her share eagerly, and would have taken his as well if we didn't feed them separately.  The only problem, that the more she ate, the thinner she was getting.

Turned out, after the blood work was done at the Vet, it proved to be Hyperthyroidism.

Google Key Word Search       Hyperthyroidism     or rather, working backwards from the type of medication that is prepared at a Compounding Pharmacy (for humans)    it's      methimazole for cats


Fifth result down in Google is this:

Hyperthyroidism in Cats

maxshouse.com/Hyperthyroidism_in_Cats.htm
The major negative aspect of methimazole is that some cats are not the best pill takers. Rather than fight these cats, methimazole can be “compounded” by some ...

Snip....... Symptoms of hyperthyroidism
Each cat responds to his or her hyperthyroidism a little differently, causing observed abnormalities to vary from cat to cat. Among the most common owner observations are the following:
  • Weight loss
  • Increase in appetite
  • Patchy hair loss or failure to groom (some cats have been observed to pull their hair out)
  • Increase in water intake
  • Increase in urine output
  • Increase in activity level (some cats are persistently restless or nervous) ...Snip

The medication for our cat is Methimazole.  Its a liquid, and its added to HER meal, and we make sure HE doesn't get a chance to finish off HER plate, NOT bloody LIKELY.....! even with the medication.

What does she look like Now?  Or more to the point, how long did it take to put some "meat" on her bones,  about four months........  Now she looks, and acts, like a healthy cat.


As for dogs, this Google search for the same medication     Methimazole for Dogs

Monday, May 21, 2012

If the Late Len Norris had to say something about the F-35, it probably wouldn't be much different than what he "said" about the F-18


OTTAWA - Canadian Heritage Minister James Moore is all in favour of sex education for kids — just not at national museums, without prior parental consent.
The minister defended his criticism of a controversial sex exhibit at the Canada Science and Technology Museum in the capital, which prompted the museum to censor a portion of the show and raise the age limit for unaccompanied children.
He denied Opposition accusations that he's interfering with the independence of museums to impose a prudish 1950s attitude toward sex education.  - Winnipeg Free Press     Snip

 Prudish 1950's attitude, certainly not.   That sort of attitude started around the 1980's when James was just a lad of four! (Born June 10, 1976)


 The Late Len Norris, cartoonist for the Vancouver Sun, wasn't kidding when he said that "history repeats itself" (1980).

After listening to MP James Moore last week stating his personal opinion in the House of Commons on when a Museum should be ....... teaching / talking about SEX ...... and at what age....and .......in the same breath his Federal Government (Harper's) is cutting Pension benefits........ to the parents..........   I brought out a Len Norris ... The Best of .... from my "library"

Here's three year old MP "James" in 1980, sitting on his Father's right knee while his sister isn't quite sure whether or not Dad knows what he's talking about.    Meanwhile Mother is saying: "Skip the birds and bees .... what gives with our old age pensions?"    The headline in the newspaper is:
   "PENSION PLANS FACE FUTURE PERIL."   

Makes you want to get out the old newspapers microfiche for that particular week/month for the day of June 22, 1980, just to find out if it was Mulroney (Conservatives).  Certainly not the Liberals.

Update May 22, 2012
 Martin Brian Mulroney was the 18th Prime Minister of Canada from September 17, 1984, to June 25, 1993  -  Wikipedia 

Pierre Trudeau .... 1980 to 1984 .... Wikipedia

Joe "Who" Clark  1979 to 1980

Pierre Trudeau    1968 to 1979

No wonder Norris had such a gift, just look at what he had to work with in Ottawa


On the page before the "Sex Ed" course above there's this:

 "You can't beat the old tried and true when it comes down to the ultimate final decision"
 (April 12, 1980)

*******************************


The book, with Editorial Cartoons from September 19, 1951 to August 9, 1983, is available in the Vancouver Public Library
ISBN: 0-7710-6820-4   Cover Illustrations: Len Norris
These cartoons have been culled from a vast lode I have been accumulating at the rate of five a week for thirty years. (Incidentally, you might notice from the cartoons that history does repeat itself).   - Late Len Norris   1980
Update May 22, 2012
Comment section suggested reading links:

From  Theo there's this background link to More on Norris


Middle of the "pack"  is Norris, just below The Archives



From EdStock over at the Galloping Beaver:
 "Apparently Simon Fraser has his entire collection."    'which consists of 1500 original drawings by the cartoonist'

****************************

The SFU Library Editorial Cartoons Collection

Citing Cartoons

If you plan to use the cartoons for a published or unpublished document, we ask that you cite the image.

For the above image your citation would look like this:
Norris, Len. "Debate on the constitution has broken out in Ottawa ... what's new and exciting with you?". February 17, 1981. Accessed from the SFU Library Editorial Cartoon Collection on [provide the date image was accessed in the MM DD,YYYY format]. 

 And

The Norris Collection at Simon Fraser University

In 1996, Len Norris donated 1,500 of his original drawings to Simon Fraser University. Appraised at $150,000, but actually priceless, the collection consists of editorial cartoons created by Norris for The Vancouver Sun between 1952 and 1985.

The cartoons are available for research by faculty, students and members of the public in Special Collections and Rare Books at the WAC Bennett Library at SFU Burnaby.

The 23 drawings from the SFU collection in this exhibit were selected to commemorate the 10th anniversary of the opening of Simon Fraser University's Harbour Centre campus.

Featuring the unruly urchin Filbert Phelps, harried teachers and parents, activist students, staid academics and other legendary Norris characters, they take a whimsical look at education, from grade school to university. Highlighted are several images of Simon Fraser University's exciting early years, a glimpse of our origins as the university enters a new century.

Simon Fraser University conferred an honorary degree on Len Norris in 1995 for his lifelong achievement and for having "enriched our lives beyond measure through laughter". We invite you to enjoy the humour and genius of Norris!

Belzberg Library
April 1999
The Norris Collection Prototype home page
 

Sunday, May 20, 2012

Are you looking for this data "British Columbia (BC) Influenza Surveillance Update"

  
Now here's some data that will help you get over thinking that you have the flu, and the information isn't just current, it's historical too, going back as far as the "beginning" of the season of September, 2007.

September 30-October 20, 2007    Weeks 40-42  (Page 4 of 7)


******************************************

This is the nuts and bolts of all the information:


or as Roy Orbison would say

"It's Over, Over, Over!"

Almost

    BRITISH COLUMBIA INFLUENZA SURVEILLANCE BULLETIN

2011-12: Number 16, Week 16

April 15 to 21, 2012

Page 2, 3, four, 5, Six

Page 2


Canada's Flu Watch

BC Liberals forcing BC Hydro into Long Term Acquistions of IPP appears to be the MO for the sale of the Liquor Distribution Branch!

The BBC especially likes this one:  The Kerr Wood Leidal Associates Ltd. ( Kerr Wood) Run-of-River Resource Assessment for B.C. ( F5) 

121 pages long, but the number crunching of just how much BC Hydro customers will be paying for Run-of-the-River projects starts on Page 117!

And if you're worried about what Rich Coleman is doing about the price of your next drink, by his selling off the Liquor Distribution rights to a third party, look no further than APPENDIX M that says this:

 20.1 Privilege: BC Hydro may award an EPA to the Proponent(s) that in BC Hydro’s sole and unfettered opinion, offers the resource(s) that best serves the interests of BC Hydro and its ratepayers. The Proposal(s) having the lowest price(s) or lowest cost to BC Hydro will not necessarily be successful. BC Hydro may award no EPAs, or may terminate the procurement process at any time. BC Hydro is not obliged to provide to Proponents reasons for the award of EPAs or the rejection of any Proposal, or for termination of the RFP procurement process.

Modified to fit the sale of BC Liquor Distribution

20.1 Privilege: BC Liquor may award an EPA to the Proponent(s) that in BC Liquor’s sole and unfettered opinion, offers the resource(s) that best serves the interests of BC Liquor and its buyers. The Proposal(s) having the lowest price(s) or lowest cost to BC Liquor will not necessarily be successful. BC Liquor may award no EPAs, or may terminate the procurement process at any time. BC Liquor is not obliged to provide to Proponents reasons for the award of EPAs or the rejection of any Proposal, or for termination of the RFP procurement process.

Don't miss out on Powertech in APPENDIX E   CLEAN COAL POWER GENERATION BY CO2 SEQUESTRATION

BC Government Publications
Index for:
B.C. Hydro Long Term Acquisition Plan (... LTAP)

2009
2008
2008 Long Term Acquisition Plan Application - Revisions of August 19, 2008    PDF 2.34 MB
Appendix A Draft of the Requested Final Order - Revision of August 19, 2008 
Appendix B B.C. Government policy and regulatory documents:
The 2007 Energy Plan (B1)
SD 10 (B2)
Clean or Renewable Electricity Guidelines (B3)
Amended HSD#1 and HSD#2 (B4)

Appendix C Table summarizing the 29 BCUC Directives arising out of the 2006 IEP/LTAP Decision along with the status of each relevant Directive and a reference to the section where the Directive is addressed in the 2008 LTAP
Appendix D 2007 Load Forecast
Appendix E Direct Testimony of Dr. Ren Orans of Energy and Environmental Economics, Inc. (E3) concerning the elasticity assumptions in the 2008 LTAP
Appendix F ROU-related documents:
Resource Options Database (RODAT) sheets (F1)
The Powertech Labs Inc. (Powertech) Technology Summary Clean Coal Power Generation by C0 2 Sequestration: (F2)
BC Hydro's wind integration cost assessment (F3)
The BC Hydro Engineering report concerning Jordan River pumped storage ( F4a)
Powertech evaluation of the Jorvic Sewage Reclaim Pipeline at BC Hydro's Jordan River Hydroelectric Project ( F4b)
The Kerr Wood Leidal Associates Ltd. ( Kerr Wood) Run-of-River Resource Assessment for B.C. ( F5)
The Garrad Hassan Canada Inc. ( GH) Assessment of the Energy Potential and Estimated Costs in B.C of Wind Energy ( F6)
The AMEC Americas Limited ( AMEC) Gas-Fired Combustion Turbine Power Plant Costs and Performance Update report ( F7)
Potential Large Hydro Project report ( F8)
Integrated System ( transmission) Planning Assumptions ( F9)
Calculation of Capacity Planning Reserves as filed in the 2007 Alcan EPA proceeding ( F10) – Revision of July 4, 2008
Estimated Unit Energy Cost ( UEC) Cost Adjustment Values ( F11)
Effective Load Carrying Capability ( ELCC) Firm Energy Load Carrying Capability ( FELCC) of Intermittent Resources report ( F12)
Comparison of the 2008 ROU to the 2006 Call ( F13)
The Risk Framework Explanation and Applications ( F14)
Resource Planning Models ( F15)
Portfolios and Analysis ( F16)
DSM Resource Options ( F17)

Appendix G Three Natsource GHG price forecast-related reports, as follows:
The 2007 GHG Offset Forecast Report ( G1)
An addendum to G1 to address the B.C. carbon tax ( G2)
Natsource's memorandum estimating the probability of the main GHG scenarios ( G3)

Appendix H Global Energy's Renewable Energy Credit Market Analysis of the Potential Renewable Energy Sale in WECC report
Appendix I Global Energy's Natural Gas Price Forecast for BC Hydro report
Appendix J Four Burrard-related reports, as follows:
AMEC's Condition Assessment and Alternative Configuration Study-Burrard Generating Station:
          Current Configuration ( J1)
          Alternative Configuration( J2)
RWDI Air Inc.'s ( RWDI):
           Burrard Consent to Operate Risk Analysis ( J3)
           Permitting Requirements for Rebuilding Burrard Thermal Generating Station ( J4)
 
Appendix K BC Hydro's DSM Plan – Revision of July 4, 2008
Appendix L Two Site C-related reports:
Summary: Stage 1 Review of Project Feasibility report ( L1)
The Stage 2: Project Definition and Consultation plan ( L2)
Site C Unit Energy Cost and Recent Orders in Council ( L3) – Revision of July 4, 2008

Appendix M Copy of the Clean Power Call Request for Proposals ( RFP)
Appendix N The Fort Nelson Resource Plan-Related and Long Term Acquisition Plan ( N1) – Revision of July 4, 2008
The Fort Nelson Generating Station Upgrade Report ( N2)

Appendix O BC Hydro's Base Plan and CRPs ( O1) – Revision of July 4, 2008
Appendix P Assessment of Puget Sound Area/Northern Intertie Curtailment Risk report
Appendix Q First Nations and stakeholder engagement report for the 2008 LTAP, the Clean Power Call, Mica Unit 5 and Mica Unit 6, Fort Nelson-related issues, and the draft Application workshop presentation and intervenor comments – Revision of July 4, 2008
Appendix R Glossary and Abbreviations