2015 Alaskan Highway News edition has their take on the benefits of the Dunvegan Site
Let's put Fort St. John's Site C on the back burner and shift the workforce downstream to Dawson City which has a much smaller footprint to match our current and future needs without costing 9.99999 Billion (includes modest cost over runs).
BC Legislative Library:
B.C. Hydro Sites C & E Hydroelectric Development Proposals : Lower Peace River Environmental Study / Thurber Consultants Ltd
Volume I Page 24 of 563
Volume I | Development Proposals and Resource Inventories | |
Volume Ia | Appendices to Volume I | |
Volume II | Impact Assessment of Basic Alternatives | |
Volume III | Supplementary Assessments |
https://www.desmog.ca/2016/08/09/u-s-hydropower-vision-exposes-b-c-s-short-sighted-thinking-site-c-dam
ReplyDeletemica dam pumped storage report -250Mw for 700m
ReplyDeleteand less transmission line loss due to it being closer to demand.
just imagine Burrard thermal esp after mexico earthquakes as backup .No T lines to worry about or need for water to generate.